When user moves or re-import the issues in the different projects which were already executed and their status was set as "Done" however, the moved or reimported issues treated as status "To Do" in their destination project. In that case, if the user wants to change the status of the moved issues as "Done", then he/she needs to use Jira Bulk operation to change the transition of the issues. Refer below mentioned steps.

Note: User must have rights to change the status (Transition) of the issues.